|
1. Supply of Fuze MP-8, Augmenting Cartridge & Primary Cartridge for Bomb ML 82 mm Mortar T-87 (Dolphin Shape) and Digital Rockwell Hardness Tester. (Published on 18/09/2026).
|
|
2. Auction of Generator. (Published on 18/09/2026).
|
|
3. Require of Building. (Published on 18/09/2026).
|
|
4. Supply of Indicator Cock.
|
|
5. Supply of Mixed Nitrox Gas.
|
|
6. A# Supply of oil Treated wooden sleeper for regular maintenance of Railway Joint, Bridge and Points & Crossing. B# Construction of a new temporary Level crossing gate with goomty Ghar (CI sheet) including installation of gate barrier and other allied works. (Published on 18/09/2026).
|
|
7. Supply of Spare Parts for Main Engine.
|
|
8. Supply of Spare Parts for Exhaust-Gas Turbocharger.
|
|
9. Installation of solar system. (Published on 16/09/2026).
|
|
10. Supply of Spare Parts for Diesel Engine.
|
|
11. Supply of CO2 Absorbent Soda Lime.
|
|
12. A# Repairing, Maintenance and Associated Works on 11/0.4 KV Lines along with Installation of Transformers at Load Center to reduce Over Load and Low Voltage Problem and Replacement of Defective Transformers. B# Repair and Maintenance Works of the 33 kV Source Line from 132/33 kV Grid and 33 kV Substations. C# Repair & maintenance works associated with Suspension, Wheel Turning, Socket Jobber Change, Brake pad change and Ladder shed maintenance included etc. D# Emergency Repair, Engine Overhauling work, Boost Controller Change, and other related works. E# The work includes the relocation of existing 33/11 kV overhead distribution lines and removal of electric poles on both sides of the road. (Published on 18/09/2026).
|
|
13. Procurement of Furniture. (Published on 18/09/2026).
|
|
14. Installation of Reverse Osmosis (RO) Plant. (Published on 16/09/2026).
|
|
15. Supply of Spare Parts for HP Air Compressor.
|