Post Tenders from the Bangladesh's #1 Tender!

Tender Notice on Water Pump and Ancillaries, Bangladesh - BDTender (61)- All Power, Gas, Energy & Electrical Systems Tenders


We are collecting all the tender and auction notices of Water Pump and Ancillaries, Bangladesh from nearly 120 national and regional daily newspapers and 1000 websites as well as e-GP website. In addition, international donor agencies, NGOs and various non-governmental organizations publish their important tender notice to our website as well. All live tender notices are the following:


Published on: 19/09/2026 (0 days back)
Visitor's Number: 0 View Image

Published on: 19/09/2026 (0 days back)
Visitor's Number: 0 View Image

Published on: 17/09/2026 (2 days back)
Visitor's Number: 3 View Image

Published on: 17/09/2026 (2 days back)
Visitor's Number: 0 View Image

Published on: 16/09/2026 (3 days back)
Visitor's Number: 2 View Image

Published on: 16/09/2026 (3 days back)
Visitor's Number: 0 View Image

Published on: 16/09/2026 (3 days back)
Visitor's Number: 0 View Image

Published on: 16/09/2026 (3 days back)
Visitor's Number: 0 View Image

Published on: 16/09/2026 (3 days back)

Corrigendum: A# Re-Excavation of Irrigation and drainage Khal/canal. B# Conducting Prework and Post work survey of Khal/Nala. C# Construction of Outlet Structure on the both side of embankment of Khal/Canal, irrigation Infrastructure (Regulator/ submerged weir/crossdams/salfon), irrigation Structure (Cross Dam/Culvert/Foot Bridge/Cattle Crossing), Pipe Culvert/Water Pass Structure, uPVC buried pipeline & Pump House and 1-cusec electric operated LLP Scheme. D# Sinking, installation and Commissioning of Artesian well. E# Conducting Survey and Submission Design of irrigation infrastructure & Structure (Regulator/submerged weir/crossdams/saifon/Culvert/Foot Bridge/Cattle Crossing etc.) and Cusec Buried Pipe Line. F# Repair and maintenance of Irrigation and Drainage Infrastructure. G# Repair of Electric Line. H# Procurement of uPVC pipe & fittings for construction of buried pipe line and Sinking and Commissioning of Artesian Well. I# Supply and installation of 1.5-cusec solar powered LLP with solar panel and necessary accessories.

Visitor's Number: 5 View Image

Published on: 16/09/2026 (3 days back)
Visitor's Number: 2 View Image

Published on: 16/09/2026 (3 days back)

A# Supply, installation, testing, comprehensive maintenance of VRF air conditioning systems including refrigerant, piping, ducting Required maintenance materials necessary accessories and associated electrical works. B# Supply and installation of necessary spare parts along with Repair, servicing, testing, maintenance of existing VRF air conditioning systems including refrigerant, piping, ducting and associated electrical works. C# Supply Electrical Accessories and Repair, Servicing & Maintenance of sub-station Equipment. D# Supply, Replacement, Testing and Commissioning of Substation equipment Including VCB, 2500A Copper Busbar System, CT/PT, IDMT Protection Relay, Battery Charger and Battery Bank, HT/LT Switchgear, Capacitor Bank, Power Factor Correction System, Control & Protection Equipment, Earthing and Other Associated Electrical Works. E# Supply of Necessary Spare Parts, Equipment and Accessories for Existing Feeder, Submersible pump, Booster, Mud and Oil Pumping Systems Including Pump Motors, Control Panels, Valves, Piping, Cables and Associated Electrical and Mechanical Items. F# Supply of VRF Indoor Unit, Refrigeration Copper Tubes, Fan Motors, Relays, Capacitors, Compressor Oil, Compressors, Control Breakers, Magnetic Contactors and Other Necessary Components, Including Installation, Repair, Servicing and Maintenance of Air-Conditioning System.

Visitor's Number: 0 View Image

Published on: 16/09/2026 (3 days back)
Visitor's Number: 0 View Image

Published on: 15/09/2026 (4 days back)
Visitor's Number: 1 View Image

Published on: 15/09/2026 (4 days back)
Visitor's Number: 2 View Image

Published on: 14/09/2026 (5 days back)
Visitor's Number: 3 View Image

Published on: 14/09/2026 (5 days back)
Visitor's Number: 1 View Image

Published on: 14/09/2026 (5 days back)
Visitor's Number: 0 View Image

Published on: 14/09/2026 (5 days back)
Visitor's Number: 1 View Image

Published on: 13/09/2026 (6 days back)
Visitor's Number: 0 View Image

Published on: 13/09/2026 (6 days back)
Visitor's Number: 0 View Image

Published on: 13/09/2026 (6 days back)
Visitor's Number: 0 View Image

Published on: 13/09/2026 (6 days back)
Visitor's Number: 0 View Image

Published on: 13/09/2026 (6 days back)
Visitor's Number: 0 View Image

Published on: 12/09/2026 (7 days back)
Visitor's Number: 4 View Image

Published on: 12/09/2026 (7 days back)
Visitor's Number: 47 View Image

Published on: 12/09/2026 (7 days back)
Visitor's Number: 0 View Image

Published on: 12/09/2026 (7 days back)
Visitor's Number: 0 View Image

Published on: 12/09/2026 (7 days back)
Visitor's Number: 2 View Image

Published on: 12/09/2026 (7 days back)
Visitor's Number: 1 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 2 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 0 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 0 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 1 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 0 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 0 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 0 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 0 View Image

Published on: 10/09/2026 (9 days back)
Visitor's Number: 0 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 1 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 0 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 2 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 1 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 2 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 1 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 0 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 0 View Image

Published on: 08/09/2026 (11 days back)
Visitor's Number: 0 View Image

Published on: 08/09/2026 (11 days back)
Visitor's Number: 5 View Image

Published on: 08/09/2026 (11 days back)

A# Re-Excavation of Irrigation and drainage Khal/canal. B# Conducting Prework and Post work survey of Khal/Nala. C# Construction of Outlet Structure on the both side of embankment of Khal/Canal, irrigation Infrastructure (Regulator/ submerged weir/crossdams/salfon), irrigation Structure (Cross Dam/Culvert/Foot Bridge/Cattle Crossing), Pipe Culvert/Water Pass Structure, uPVC buried pipeline & Pump House and 1-cusec electric operated LLP Scheme. D# Sinking, installation and Commissioning of Artesian well. E# Conducting Survey and Submission Design of irrigation infrastructure & Structure (Regulator/submerged weir/crossdams/saifon/Culvert/Foot Bridge/Cattle Crossing etc.) and Cusec Buried Pipe Line. F# Repair and maintenance of Irrigation and Drainage Infrastructure. G# Repair of Electric Line. H# Procurement of uPVC pipe & fittings for construction of buried pipe line and Sinking and Commissioning of Artesian Well. I# Supply and installation of 1.5-cusec solar powered LLP with solar panel and necessary accessories.

Visitor's Number: 1 View Image

Published on: 07/09/2026 (12 days back)
Visitor's Number: 1 View Image

Published on: 07/09/2026 (12 days back)
Visitor's Number: 1 View Image

Published on: 07/09/2026 (12 days back)
Visitor's Number: 1 View Image

Published on: 07/09/2026 (12 days back)
Visitor's Number: 0 View Image

Published on: 07/09/2026 (12 days back)
Visitor's Number: 0 View Image

Published on: 09/09/2026 (10 days back)
Visitor's Number: 3 View Image

Published on: 06/09/2026 (13 days back)
Visitor's Number: 1 View Image

Published on: 05/09/2026 (14 days back)
Visitor's Number: 0 View Image

Published on: 02/09/2026 (17 days back)
Visitor's Number: 0 View Image

Published on: 30/08/2026 (20 days back)
Visitor's Number: 0 View Image

Published on: 31/08/2026 (19 days back)
Visitor's Number: 13 View Image

Published on: 25/08/2026 (25 days back)
Visitor's Number: 4 View Image