A# Preventing water falling through roof of washroom of ground floor, 1st floor, 2nd floor, installation of new plaster after removing old plaster in ceiling wash, painting and replacement of old false ceiling in main building. B# Construction of dustbin shed with angle behind annex building, extended motor bike shed attached with dustbin shed, painting of porch dome, painting of guide wall, construction of new guide wall by ceramic brick in base of tree, cleaning and painting of plinth with slab. C# Raising and reconstruction of risky and decrepit boundary wall. D# Retrofitting work in earthquake damaged head office. E# Repair of roof, improvement of drainage and sewerage system, repair of road and boundary wall and other repair work of various buildings. (Published on 26/02/2026).