A# Reconstruction of two separate washrooms (toilets) for men and women in the existing washroom of conference room, installation of a wash block with a granite counter top basin and sink, repair of the false ceiling, externalization of door of prayer room, painting and other repair work of corridor. B# Repair & renovation work of room on the 1st floor of the Prison Headquarters building to convert it into the office. C# Developments works of Lotus ponds and road construction of water body work. (Published on 27/06/2025).