Construction of flour mill, day time bath, installation of toilet, installation of dustbin, raising the height of the segregation wall of the existing women's ward, installation of additional overhead water tanks and supply lines on the roofs of various buildings, construction of a perimeter wall on the western side, construction of a link corridor road and gate, and installation of 2 deep tube wells and 5 hand tube wells, along with other ancillary works. (Published on 31/10/2026).