Dead line checking of 132 & 230 kV Transmission Line and Disk Insulator change work.
A# Construction work of washroom, barbed wire Y shape on boundary wall, painting of boundary wall, flag stand installation, preservation & repair work of drains, maintenance & repair work of fencing at switch yard. B# Maintenance work and annual deadline checking of transmission line. C# Renovation & repair work of residential building (Used as Ansar Barracks).
A# Painting works of tower. B# Tower leg muffling and painting work.
A# Replacement of 132KV old Dead Tank Hydraulic circuit Breaker with new spring operated live tank CB for Transformer Tr-01 & Tr-02. B# Tower Leg Muffling, Painting and other Maintenance Works.
A# Construction of property line around the substations boundary wall. B# Repair & maintenance of ansar barak with main store. C# Painting of full tower transmission line and deadline checking of tension tower. (Published on 08/11/2024).
A# Cutting jungle & shrub at different places and Remove/Clean garveg. B# Supply of LED Light.
A# Supply of 10kV Insulation Resistance Tester, Digital Clamp Meter and Binocular. B# Bay Reconductoring work and 400kV annual maintenance work at Sub Station.
Oil leakage repair and maintenance work of 230/132 kV MT-01 Transformer , 132/33 kV T-01 and 132/33 kV T-02 Transformer.
Bay Reconductoring work and 400kV annual maintenance work at Sub Station.
A# Supplying of LED Flood Light. B# Replacement of Transformer Bottom Steel Grating of Auto Transformer-3 Blue & Yellow Phase. C# Civil Maintenance Work of Control Room Building.
A# Painting of switch yard structure. B# Supply of outdoor LED flood light and 33kV CT. C# CC & cement concrete tiles work, roof tiles work of control room and making of garage.
Transportation of 50/75 MVA Faulty Transformer, Untanking and Visual Inspection Core and Winding and Provide Expert Suggestion for repairing.
Supply New fire extinguisher & refilling expired fire extinguisher.
Sub-soil Investigation work.
Supply and fixing of foam type fire extinguisher.
Tower leg muffling work.
A# Supply, Installation, Testing and Commissioning of 132 kV SF6, Three Phase GIS IVT/PT GIS IVT/PT on 132 kV Under Ground Cable lines GIS bay . B# Repair & Maintenance of herringbone bond road. (Published on 01/11/2024).
Corrigendum: Design, Supply, Erection, Testing & Commissioning of capacity enhancement and Capacitor Bank installation with associated switchgear in existing grid substation. (Published on 01/11/2024).
Transportation, Inspection and Testing of faulty 132/33kV 50/75MVA Power Transformer. (Published on 31/10/2024).
A# Herring Bone, surface drain and fencing repair work. B# Repair & Maintenance of herringbone bond road.
A# Dead line checking & repairing work (checking & tightening the Nut-Bolt of jumper/loop & damper; Insulation checking & cleaning the String insulator; Inspection of damper & conductor spacer and have to be replaced if required) of 400 kV, 230 kV & 132 kV Transmission lines. B# Supply of manpower through outsourcing. C# Annual Maintenance Dead line checking & repairing work (Checking Nut-Bolt Tightness, Cleaning Disc Insulator & Inspection of String and replace it if required) of Transmission lines.
A# Repair and maintenance (Annual maintenance: Jumper tightening) of different transmission lines, (Annual maintenance with clamp and connector tightening for bus-bar, conductor loop, jumper etc.) of different grid sub-station. B# Construction of approach road.
Supply of Silica Gel and LED Light. (Published on 24/10/2024).
Dismantle & Carrying of released 25/41 MVA Transformer and installation, testing, commissioning & put into solid parallel with existing Transformer.