Power Grid Company of Bangladesh, Bangladesh publishes their Tender notices in various platform. We are collecting all these tenders from different era. All live Power Grid Company of Bangladesh, Bangladesh tender notices are following:
Repair and Maintenance of control building.
Corrigendum: Design, Supply, Installation, Testing & Commissioning of 132/33 kV AIS Substation. (Published on 30/12/2025).
Ansar Camp Repair-Maintenance and re-establishing chain link fencing around RPC building. (Published on 29/12/2025).
A# Supply of Capacitor cell, Valve cooling System (VCS) Cooler fan and Illumination system. B# Expansion of Equipment Pad. (Published on 23/12/2025).
A# Supply of safety security & working tools. B# Repair & Maintenance of IP Camera. (Published on 22/12/2025).
Supply of Maintenance Tools and Materials. (Published on 19/12/2025).
A# Yearly basis Cleaning and cutting jungle, scrubs of tower base and road. B# Tower Leg Muffling and Painting works of tower of transmission line. C# Construction of open store yard. (Published on 19/12/2025).
A# Tower Leg Painting and Others repair Maintenance Work. B# Purchase of Sillica gel. C# Supply, fitting-fixing and installation of IP Camera. D# Repair & Maintenance of Building and others. (Published on 19/12/2025).
Supply of LED Flood light. (Published on 19/12/2025).
A# Fabrication, installation of tower members, brass welding & painting works of transmission towers. B# Yearly basis cleaning of office building, roads, parking area, drains, toilets & cutting of jungle and shrubs. C# Repair & maintenance of main entrance way on both sides at grid sub-station. (Published on 19/12/2025).
A# Supply, installation & Commissioning of IP Camera based Surveillance System. B# Renovation/Repair, Maintenance and Painting Works of Control Room Building, Boundary Wall, Barbed Wire and Chain Link Fencing. C# Supplying, Installation & Commissioning of Air Cooler for Substation and office. (Published on 18/12/2025).
A# Supplying ,Installation, testing and commissioning of solar panel system and IP camera. B# Refilling of expired fire extinguisher for all grid substation and office. (Published on 18/12/2025).
Repair Work of Grid Substation Switchyard Cable Trench, Drain, Store Yard Repair and Mortaring, Grass Cleaning, Gravel Water Wash and Re-Laying. (Published on 15/12/2025).
Corrigendum: Design, Supply, Installation, Testing & Commissioning of 132/33 kV AIS Substation. (Published on 05/12/2025).